Extraordinary Imagery. Affordable Prices.
Extraordinary Imagery.
Affordable Prices.
Change Profile
Lightboxes
Past Orders
Shopping Cart
Apply for House Account
 0
 0
Stocktrek_Images_STK102922M_preview
Add to
Lightbox
Calculate
Price
Download
High Res
Description:
A UH-1Y, the latest marine aircraft based on the workhorse Huey utility helicopter, is being winched into a C-5B to determine the ramps and positions to safely transport as many of these and the new AH-1Z Super Cobra (seen beside the C-5). C-5 Galaxy and crews came together at Travis Air Force Base, California, to determine how the new UH-1Y and AH-1Z helicopters best fit into the cargo bay of the C-5 Galaxy. The efforts of this day will determine load numbers and configurations of these helicopter inside the C-5. It is expected that these new helicopters will begin to be delivered to Iraq and Afghanistan by the end of 2009. The helicopters differ significantly from previous versions.with it's 4-blade composite rotors, T-700 engines, and a stronger transmission. These and many other upgrades improved power, maximum altitudes, reliability, maintainability and combat survivability of these helicopters.

A UH-1Y being winched into a C-5 Galaxy.

Image ID: STK102922M
Credit:
This Image is Released for Editorial Use Only.
Buy Art Prints
  Buy Art Print
IMAGE SPECS: Rights Managed
49.5 MB   17x11.3 in   300 dpi   5099x3393 px   
* Volume discounts available. Call or email us to have promo code created for you.
** Large format files available on select images. Send us a Media Request.
SIMPLE RM PRICING
$20.00
$50.00
$100.00
$125.00
DESCRIPTION
A UH-1Y, the latest marine aircraft based on the workhorse Huey utility helicopter, is being winched into a C-5B to determine the ramps and positions to safely transport as many of these and the new AH-1Z Super Cobra (seen beside the C-5). C-5 Galaxy and crews came together at Travis Air Force Base, California, to determine how the new UH-1Y and AH-1Z helicopters best fit into the cargo bay of the C-5 Galaxy. The efforts of this day will determine load numbers and configurations of these helicopter inside the C-5. It is expected that these new helicopters will begin to be delivered to Iraq and Afghanistan by the end of 2009. The helicopters differ significantly from previous versions.with it's 4-blade composite rotors, T-700 engines, and a stronger transmission. These and many other upgrades improved power, maximum altitudes, reliability, maintainability and combat survivability of these helicopters.
Search for related media
Item added to cart
Item added to lightbox
Item is already in the lightbox
x
Stocktrek Images - Loading...